Flatiron Mike’s EDR 2008 Build: The finale

Header-9
By Flatiron Mike
Ed Note: You can view all the entries related to this build at it’s own special web address:
http://www.knucklebusterinc.com/features/category/flatiron_mike_edr/

Flm15 01

The done deal - she is oh so sweet, even if she didn’t make it to the EDR.
More pics when you click read more.

Read more…

May 13th, 2008 by grail21 in Home Built Motorcycles, Bitchin' Bikes, Flatiron_Mike_EDR | Comment (1)

Flatiron Mike’s EDR 2008 Build: Part 14

Header-9
By Flatiron Mike
Ed Note: You can view all the entries related to this build at it’s own special web address:
http://www.knucklebusterinc.com/features/category/flatiron_mike_edr/
Just before the heavy rains came through….

Remaining checklist: tail light / license plate mount fab (and location), battery mount fab, wiring, plumbing, front brake / throttle cables, little bits ‘n pieces, fluids, AND THEN shakedown - ugh

Flm14 01
Flm14 03-1Flm14 02-1

.

March 21st, 2008 by grail21 in How To, Home Built Motorcycles, Bitchin' Bikes, Flatiron_Mike_EDR | No Comments

Flatiron Mike’s EDR 2008 Build: Part 13

Header-9
By Flatiron Mike
Ed Note: You can view all the entries related to this build at it’s own special web address:
http://www.knucklebusterinc.com/features/category/flatiron_mike_edr/

RUNNING OUT OF TIME…. ugh

Anchored the exhaust using ’stock’ 1″ and 1 3/4″ P clamps on the brake tube and down tube, will tie both together with a piece of flat stock (last pic)

Flm13 01-1Flm13 02-1Flm13 03-1Flm13 04-1Flm13 05-1

March 18th, 2008 by grail21 in How To, Home Built Motorcycles, Flatiron_Mike_EDR | No Comments

Flatiron Mike’s EDR 2008 Build: Part 12

Header-9
By Flatiron Mike
Ed Note: You can view all the entries related to this build at it’s own special web address:
http://www.knucklebusterinc.com/features/category/flatiron_mike_edr/

Mike sent in some photographic evidence that things are coming along.Unfortunately no witty commentary or pipe smoking references, but the pics will do for now.

Flm12 01Flm12 02
Flm12 03Flm12 04
Flm12 05

March 13th, 2008 by grail21 in How To, Home Built Motorcycles, Bitchin' Bikes, Flatiron_Mike_EDR | Comment (1)

Flatiron Mike’s EDR 2008 Build: Part 11

Header-9

By Flatiron Mike
Ed Note: You can view all the entries related to this build at it’s own special web address:
http://www.knucklebusterinc.com/features/category/flatiron_mike_edr/

Ed note: Quick update from Mike with some finished frame pics.

Flm11 01Flm11 02Flm11 03

March 4th, 2008 by grail21 in How To, Home Built Motorcycles, Bitchin' Bikes, Flatiron_Mike_EDR | No Comments

Flatiron Mike’s EDR 2008 Build: Part 10

Header-9

By Flatiron Mike
Ed Note: You can view all the entries related to this build at it’s own special web address:
http://www.knucklebusterinc.com/features/category/flatiron_mike_edr/

How do you mount a non stock headlight bracket to a VL Springer ??? Don’t know, never had a VL Springer before. Here’s my take on the task on this ‘balmy’ 40 deg. day.

The travel of the front leg shouldn’t interfere with the bracket. Again, shouldn’t.

Tapped the dampner hole at the bottom of the neck. Bent a piece of 1″ flat stock and drilled 2 holes. Bolted up the bracket and mounted the headlight. Will pop a small set screw on the bottom of the Spinger through the bracket to keep it from ‘drifting’ and will ’shape’ the bracket around the springs. voila
01-1002-1003-1004-10
.

February 28th, 2008 by grail21 in How To, Home Built Motorcycles, Bitchin' Bikes, Flatiron_Mike_EDR | No Comments

Flatiron Mike’s EDR 2008 Build: Part 9

Header-8
By Flatiron Mike
Ed Note: You can view all the entries related to this build at it’s own special web address:
http://www.knucklebusterinc.com/features/category/flatiron_mike_edr/
Tanked.

Here’s the scoop on the Sunday action. Fabbed a surrogate tunnel / tank mount to the um, uh, NO IT’S NOT A WASSELL (unless there was a Tokyo branch office). Split a length of steel tube, shaped and welded to tank. marked and drilled for the backbone.
01-902-903-904-9

Drilled and tapped the front part of the backbone. For the rear mount, used a Fab Kevin bung. Drilled and welded and finally got the tank mounted. Props to Jon Volk once again for the expert welding and use of the HEATED shop, thanks.
05-806-507-508-6

February 25th, 2008 by grail21 in How To, Home Built Motorcycles, Bitchin' Bikes, Flatiron_Mike_EDR | No Comments

Flatiron Mike’s EDR 2008 Build: Part 8

Header-7
By Flatiron Mike
Ed Note: You can view all the entries related to this build at it’s own special web address:
http://www.knucklebusterinc.com/features/category/flatiron_mike_edr/
Ed note: The answer the cliffhanger from the last post, Mike chose the Wassell tank. The next installment of this series will be about the gas tank mounting process. Now onto our regularly scheduled program…

Need to locate the coil. It’ll fit nicely under the tank and shouldn’t interfere with the throttle line or gas line - I said shouldn’t.

A piece of flat stock and some nuts and bolts does the trick:
01-702-7

Coil bracket mounted
03-7

Coil mounted
04-705-6

February 21st, 2008 by grail21 in How To, Home Built Motorcycles, Bitchin' Bikes, Flatiron_Mike_EDR | Comments (4)

Flatiron Mike’s EDR 2008 Build: Part 7

Header-6
By Flatiron Mike
Ed Note: You can view all the entries related to this build at it’s own special web address:
http://www.knucklebusterinc.com/features/category/flatiron_mike_edr/
Just ’cause you can, doesn’t mean you should. Bored and (almost) tanked (can you stand the pun and irony!). Here’s some pics of gas tank options to pass the time.

5 gal. Sportster (will be chopped, eventually):
01-6

Coupla gal. Hodaka Wombat Combat (?!):
02-603-6

H-D Leggero (whoa!):
04-605-5

Threw this Honda alloy number on too. This will be for the Kaw Cafe build once the Flathead’s completed
08-409-410-4

Standard Wassell
11-312-213-2
Here’s the last tank I tried. Ain’t gonna work
14-215-216-2

And the winner is….

Stay tuned for the next installment

February 18th, 2008 by grail21 in How To, Home Built Motorcycles, Bitchin' Bikes, Flatiron_Mike_EDR | Comments (6)

Flatiron Mike’s EDR 2008 Build: Part 6

Header-5
By Flatiron Mike
Ed Note: You can view all the entries related to this build at it’s own special web address:
http://www.knucklebusterinc.com/features/category/flatiron_mike_edr/

Some mock up pics for riding position.

Mounted some clubmans just for giggles. Found the donor bars (afore mentioned clubmans) spacer for the center of the Topper bars assembly and fabbed. Mounted the fine Xian / Biltwell seat and re-mounted the rear fender where it needs to be. Sounding like a broken record, but can’t powder coat the frame and final assemble ’til the gas tank is fingered (?!). We’ll see. Happy Sunday, Fuckers…
01-403-402-4

Biltwell seat pan, leather work by Xian)
04-405-3
.

January 24th, 2008 by grail21 in How To, Home Built Motorcycles, Bitchin' Bikes, Flatiron_Mike_EDR | No Comments