Flatiron Mike’s EDR 2008 Build: Part 9

Header-8
By Flatiron Mike
Ed Note: You can view all the entries related to this build at it’s own special web address:
http://www.knucklebusterinc.com/features/category/flatiron_mike_edr/
Tanked.

Here’s the scoop on the Sunday action. Fabbed a surrogate tunnel / tank mount to the um, uh, NO IT’S NOT A WASSELL (unless there was a Tokyo branch office). Split a length of steel tube, shaped and welded to tank. marked and drilled for the backbone.
01-902-903-904-9

Drilled and tapped the front part of the backbone. For the rear mount, used a Fab Kevin bung. Drilled and welded and finally got the tank mounted. Props to Jon Volk once again for the expert welding and use of the HEATED shop, thanks.
05-806-507-508-6

Leave a Reply